Inside the new walk-in beer cave at Premier Shopright — fully stocked drink walls under illuminated sky-effect ceiling panels
Cardiff · Full-store refit · Case study

Bare shell to
beer cave.

A Premier store on one of Cardiff’s busiest streets, stripped back to nothing and rebuilt — with thirteen new cabinets, a walk-in beer cave, and every delivery choreographed to the minute.

0New cabinets installed
0Walk-in beer cave
0J&E Hall condensing units
01

The job

Premier Shopright, 28–30 City Road — a full refurbishment with the store stripped back to a bare shell. Old refrigeration, shelving, flooring and ceiling all out before the new shop could go in. Craven Cooling was brought in to run the complete refrigeration side.

A busy part of Cardiff, a customer who needed the doors back open fast, and a programme shared with shopfitters, transport companies and every other trade on site.

02

Before / after

From the old shop front to a modern Premier store. Drag the line.

Before: the old shop front on City Road with a skip outside during strip-out
After: the refurbished Premier Shopright with its new yellow fascia
Before · strip-out After · Premier Shopright
Craven Cooling vans and forklift collecting the J&E Hall condensing units for delivery to site
Logistics is half the job. Craven managed the deliveries end to end — early-morning slots, several transport companies, a temporary unloading area on a dense city street.
03

The challenge

City Road is one of Cardiff’s busiest, most densely populated streets. Constant pedestrians, next to no space for deliveries — and no room in the programme for anything arriving out of order.

Strip-out at pace

Day one: existing refrigeration decommissioned, removed and readied for disposal — on the same day the first new cabinets began arriving.

A street with no slack

Limited access, constant footfall, nowhere to leave kit. Early-morning deliveries, a temporary unloading area, and the team managing pedestrians and traffic while cabinets came off the lorries.

Every stage in order

Several trades on the same tight programme. Pipework and condensing units prepared before the cabinets were placed, so the installation moved without waiting on anyone.

The showpiece
04

The beer cave

A dedicated walk-in cold room for drinks — a shop within the shop, with its own entrance, its own climate and a ceiling that thinks it’s the sky.

The illuminated Beer Cave entrance inside Premier Shopright, flanked by red wine shelving
Inside the beer cave: stocked drinks walls under the illuminated sky-panel ceiling
Inside the cave — chilled walls of stock under sky-effect panels.
The beer cave's cooling unit mounted on the brick-effect wall above the wine shelving
Its own dedicated cooling, tucked above the wine wall.
One refit 0 new cabinets, plus the cave

Five Tefcold LGF7500 freezers, seven Arneg multidecks and a Tefcold LPD900F — pipework and condensing units prepared in advance, so the final installation kept pace with the customer’s reopening date.

05

The kit

A complete refrigeration package for a full-range convenience store.

Tefcold LGF7500 ×5Glass-door frozen wall
Arneg Osaka 3.75m ×4Chilled multideck runs — dairy & soft drinks
Arneg open multideck 2.5m ×2Fresh & produce
Arneg open multideck 1.5mFood to go
Walk-in beer caveDedicated drinks cold room
Tefcold LPD900FDisplay freezer
J&E Hall condensing units ×5Racked, piped and commissioned
The soft drinks Arneg Osaka run fully stocked with canned drinks
The soft-drinks wall — Arneg Osakas, stocked to the millimetre.
The run of Tefcold LGF7500 glass door freezers under the Frozen sign
Five LGF7500s under the Frozen neon.
Open multideck stocked with fruit and vegetables in crate-style shelving
Fresh produce on the open multidecks.
The dairy multideck run under the illuminated Dairy sign
Dairy, lit and trading.
Five J&E Hall condensing units racked on a steel frame outside the store
The engine room — five J&E Hall units, racked and commissioned.
Aisle view between the produce multideck and the freezer run
Down the aisle: chilled one side, frozen the other.
Due to the scale and the deadline, the full Craven Cooling team attended site — so different parts of the installation happened at the same time.
Premier Shopright · 28–30 City Road, Cardiff

Job and photography: Kyle Craven, Craven Cooling

Big refit? Bring us the whole thing.

Decommissioning, disposal, deliveries, installation — from the first skip to the beer cave’s last light panel, one team ran the cold side of this refit. Yours next.