A serious electrical fire gutted Kenfig Hill Superstore. Craven Cooling came back to rebuild the entire refrigeration package from the ground up — and had the store trading again in two months.
The job
Our team had installed the original refrigeration at Kenfig Hill Superstore around a year earlier. Then a serious fault in the incoming mains electrics — nothing to do with the refrigeration — set off a fire that left the store needing a major rebuild.
Craven Cooling was brought back to manage the complete refrigeration side of the rebuild: assess what had been lost, design a new layout, and get one of the largest stores of its kind in Wales trading again.
The challenge
This wasn’t one trade working alone. Electricians, builders, shopfitters, flooring and ceiling teams and our own engineers all needed the same spaces, in the right order, on a programme the customer needed to move as fast as possible.
Narrow, busy roads
Kenfig Hill’s roads left little room for delivery vehicles. Remote cabinets, freezer cases and coldroom panels had to be brought in on a careful schedule so the surrounding streets never blocked up.
Every trade, one site
A delay from any one contractor could hold up the whole rebuild. Our stages had to slot around builders, electricians and shopfitters working the same store at the same time.
A big refrigeration package
Seven condensing units, two walk-in caves and a mix of chilled, frozen, heated and specialist display equipment — all needing to be built, connected and commissioned to schedule.
Before / after
The store had already been completely fitted out before the fire tore through it. Drag the line to see the same store, rebuilt.

Considering the extent of the damage, the size of the building and the amount of work needed from every contractor on site, reopening the doors that quickly was a major achievement for everyone involved.

The refrigeration cube
Rather than simply replace what had been lost, the rebuild became a chance to improve the store’s whole layout. A refrigeration cube was designed and built as a central island — an eye-catching feature that divides the customer journey into clear sections, without relying only on cabinets around the walls.


The kit
One of the largest refrigeration packages Craven Cooling has delivered — chilled, frozen, heated and specialist display, built around two walk-in caves and a purpose-made external condensing frame.
















Rather than simply replace what had been lost, the project became an opportunity to build an even stronger finished store.Kenfig Hill Superstore · Pisgah Street, Kenfig Hill, Bridgend
Job and photography: Kyle Craven, Craven Cooling
Rebuild, refit, reopen.
Fire damage, insurance rebuilds, full store fit-outs — we manage the whole refrigeration package, coordinated around every other trade on site. One call covers design, supply, installation and commissioning.